Construction + Industrial · Walking Floor Trailers · Siler City, NC

Walking floor trailers
in Siler City, NC.

The trailer holds about 120 cubic yards and loads over the top, at a dock or by excavator. We send it from our Mebane yard, about fifty minutes north of Siler City.

  • DispatchMebane yard (~50 min)
  • CapacityAbout 120 cu yd
  • LoadingTop · Dock · Excavator
  • HoursMon – Fri · 7:30 AM – 4:30 PM
WasteAway's walking floor trailer for Siler City, NC hauls

Loading, waste, homes

What the rules mean for
your Siler City trailer

Siler City’s Unified Development Ordinance (UDO), adopted June 1, 2026, covers the town and its extraterritorial jurisdiction (ETJ). Chatham County issues building permits, and erosion control here is the State’s. The cards cover where the trailer fills, what rides together and trailers at homes.

Where it loads

Where the trailer loads

Plan on filling the trailer on your lot or at a loading dock, not in the street; the streets card below gives the State and Town rules. If the trailer will sit at a business, ask Town Planning where it can go.

What rides together

Keeping waste streams apart

State law (G.S. 130A-290) leaves inert, land-clearing and yard debris out of construction and demolition (C&D) waste. So load roofing or building debris on its own, and stumps and brush on their own. Tell us what each load holds when you call.

At a home

Trailers at single-family homes

At single-family detached homes, the UDO bars regularly parking commercial or industrial trailers with more than one axle outside a substantially enclosed structure. Its exceptions include loading or unloading, and work in connection with an approved construction project. Ask Town Planning how it applies to your job.

Haul by job

Which haul fits your
Siler City job

Find the kind of work on the left and read across. The first five rows point to the walking floor trailer, and four of them say how it gets loaded. The last row is a pile one 30-yard dumpster can hold, where a dumpster likely serves you better.

The haul that suits each kind of Siler City job
Your Siler City jobThe haul
Teardown, remodel or framing debris past what one dumpster takesThe walking floor trailer, which holds about 120 cubic yards
Pallets and bulky waste at a plant or warehouse dockThe trailer, backed into your dock with a dock plate, then loaded by forklift or pallet jack
Stumps, limbs and brush from a lot being clearedThe trailer, positioned with your crew so an excavator loads it live
Shingles, roofing debris and insulation board from a tear-offThe trailer, filled over the top
Bulk recyclables, mulch or wood waste leaving the siteThe trailer, top-loaded and emptied by its moving floor
A pile that fits in one 30-yard dumpsterLikely a dumpster, since the trailer holds about four times that much

Siler City jobs

Siler City jobs
a walking floor fits

Each card covers one kind of work, how the trailer loads for it and the rule to plan around. The industrial card names a local plant from a 2026 report.

By type of work

Hauling for builds,
plants and land clearing

Builds and roof tear-offs load over the top or by excavator. Plants use a dock where there is one, and clearing jobs an excavator. Each tab lists the steps before work.

Walking floor hauling for Siler City builds and demolition.
The haulA single trailer that holds about 120 cubic yards; your quote gives the exact capacity.
LoadingBuilding debris and tear-off go in over the top. For excavator loading, our team coordinates with your crew to position the trailer.
MaterialsDebris from new construction, remodels and teardowns, and roof tear-off: shingles, roofing debris and insulation board.
Before workChatham County’s Department of Central Permitting issues building permits for Siler City. Ask Town Planning and the County what a demolition needs. Before a building demolition, the State’s Health Hazards Control Unit wants notice at least 10 working days ahead, even with no asbestos. These are yours or the owner’s to handle.
Historic districtDowntown’s Siler City Commercial Historic District is on the National Register. The UDO also sets design standards for nonresidential buildings and has a downtown overlay district. Ask Town Planning what applies before work there.
Kinds of workNew homes and buildings, remodels, teardowns and roof tear-offs.
Walking floor hauling for Siler City plants and land clearing.
The haulOne trailer covers both kinds of work, priced by the load or by the hour. The estimate is free.
LoadingIf your site has a loading dock, we can back the trailer into it with a dock plate for a forklift or pallet jack. On a clearing job, we position it with your crew.
MaterialsPlants send palletized or bulky materials, industrial waste and recyclables. Clearing sends land-clearing debris, mulch and wood waste.
Before workThe Town’s Planning FAQ says projects that include new construction, expansion, or a change of ownership, occupancy or use need a zoning permit, in Town limits and the ETJ. Ask Town Planning what the trailer’s spot needs; City Hall’s number is 919-742-4731. Plans and permits are yours or the owner’s to get.
Kinds of workPlant and warehouse cleanouts, and clearing a lot ahead of a build.

Siler City’s rules

Siler City rules:
streets, land, streams

Streets, erosion control and the water supply watershed decide where a Siler City trailer can sit. Each card says what that means for your trailer and who to ask. Historic downtown is in the builds tab.

Any public street

State and Town street rules

Fill the trailer on your lot or at your dock, not in the street. State law bars leaving any vehicle standing in a street’s main-traveled portion unless it’s disabled. The Town Code, as the UDO quotes it, bars parking any vehicle on a town street whose paved portion is 28 feet wide or less. State roads such as Chatham Avenue and US 64 need a written North Carolina Department of Transportation (NCDOT) permit for any obstruction.

Before disturbing land

Erosion control from the State

In Siler City, erosion control is the State’s, not Chatham County’s, through the North Carolina Department of Environmental Quality (NCDEQ). Most work disturbing more than one acre on a tract needs an approved erosion and sedimentation control plan before it starts. Ask NCDEQ what your site needs; the plan is yours or the owner’s to get.

In the water supply watershed

Watershed buffers under the UDO

Inside the public water supply watershed on the Town’s map, the UDO calls for a vegetative buffer of at least 100 feet along perennial waters for development activities. Near the Rocky River, buffers run 200 feet along the river and the streams within 2,500 feet of it. Ask Town Planning whether your site is in the watershed, and keep the trailer and its route out of any buffer.

Loading and pickup

How loading and pickup
work in Siler City

We dispatch the trailer from our Mebane headquarters yard on Gibson Road, about fifty minutes north of Siler City. Smithfield is our backup yard. Your crew loads it on your lot or at a dock, then calls us for pickup.

Primary dispatch

130 N Gibson Rd

Siler City trailers leave from our Mebane headquarters yard, about fifty minutes north of town, with Smithfield as backup. When you book, have the site address, the material and the loading method ready.

On site

Loading day

If your site has a loading dock, we can back our trailer into it with a dock plate. With an excavator, our team coordinates with your crew to position the trailer. Pick a spot off the street, clear of any watershed buffer and the tree fence.

Pickup

Pickup and more loads

When it’s full, call us to coordinate a pickup time and we’ll be there. We work Mon – Fri · 7:30 AM – 4:30 PM, closed weekends. If the job could fill more than one trailer, say so when you book.

Siler City trailer FAQ

Siler City walking
floor trailer questions

Capacity, a site with no room to load, the load, pricing, land clearing, Town debris collection and dumpsters. If your question isn’t here, call before you book.

How much does a walking floor trailer hold?

The trailer holds about 120 cubic yards, around four times a standard 30-yard dumpster. Capacity can vary by configuration, so your quote gives the exact figure.

What if our Siler City site has no room to load?

Call us before you book. The trailer loads on your lot or at a loading dock, not in the street. The streets card on this page gives the State and Town parking rules. Ask the Town what applies to your street.

What should I tell you about the load?

What the material is, roughly how much, and how it loads: over the top, at a dock or by excavator. Point out anything you can’t identify. Mention white goods too, since State law bars knowingly landfilling them.

How do you price a walking floor haul?

We charge by the load or by the hour, and the estimate is free. Send the material, a rough amount and the loading method, and we’ll price the haul.

Do you haul land-clearing debris in Siler City?

Yes. An excavator loads stumps, limbs and brush live, and mulch and wood waste go in from the top. Where trees are kept to meet Siler City’s landscaping rules, the UDO keeps construction traffic and stored vehicles and materials out of the protected areas. We set the orange tree fence, and our Siler City fencing page covers it. Plans and permits are yours or the owner’s to get.

Will the Town collect construction or tree debris?

Not construction debris. The Town’s cart and bulky-item collection guidelines, effective July 1, 2025, say construction and demolition waste won’t be collected. A Town notice says tree debris from a landscape worker or tree contractor won’t be hauled away by Town forces. For a site outside town limits, ask Chatham County about its C&D Recycling Ordinance.

Do you rent dumpsters in Siler City too?

Yes. If one 30-yard dumpster takes the whole pile, a dumpster is probably the simpler order. Our Siler City dumpster page lists the sizes, or call and we’ll help you choose.

Get a walking floor
quote in Siler City

Tell us the Siler City site address, what you’re hauling and how it loads: over the top, at a dock or by excavator. We price by the load or by the hour, and your quote gives the trailer’s exact capacity.