Our headquarters town · Temporary Fencing · Mebane, NC

Fence rental
in Mebane, NC.

Panels, driven posts, locking gates and the tree protection fence, installed and removed by our team. Our yard is on Gibson Road, five minutes from City Hall; next day on orders by 4 PM.

  • DispatchMebane yard (~5 min)
  • Order cutoff4 PM for next-day
  • Fence typesPanels & driven posts
  • InstallSetup & removal
A WasteAway temporary fence installation, the kind we set on Mebane, NC job sites

Tree, road and water rules

What Mebane’s rules
mean for your fence

Here is what Mebane’s Unified Development Ordinance (UDO) means for a fence line. The cards cover saved trees, the street right-of-way, and stream buffers and floodways.

Tree rules

Tree protection fencing

Vegetation a plan preserves, buffers included, must be fenced with a sturdy and visible fence before grading begins. The fence must be at least 4 feet high, sit outside the drip line and stay up until all site work is completed. The UDO names no color. Send the plan and we set the tree protection fence.

Right-of-way

Street right-of-way agreements

The UDO keeps structures out of a street right-of-way unless whoever controls it signs an encroachment agreement. The City's fee schedule lists its agreement at $100 and marks that line not applicable to existing residences or the recognized Downtown District. Ask City Engineering what applies to a temporary fence. State roads belong to the North Carolina Department of Transportation (NCDOT).

Water

Stream buffers and floodways

In a regulated floodway, fences that could block floodwaters, such as wire mesh, must meet the UDO's floodplain limits. Jordan Lake riparian buffers carry their own rules, and a Buffer Authorization Permit sits on the City's Planning Permits page. Ask the Planning Department before a run crosses a stream buffer or floodway.

Job to fence

Which fence fits
your Mebane job

Each Mebane job on the left gets the fence on the right. Where a row needs the Zoning Administrator, Planning or NCDOT, it names that office. Those approvals are yours to get, not ours.

The temporary fence we'd send, by Mebane job
Your Mebane jobThe fence
A build near Exit 152, like the Buc-ee's travel centerChain link on driven posts, 8 ft, with a locking vehicle gate for the life of the build
Trees or buffers the plan preservesOur tree fence, at the line you and the Zoning Administrator settle. The UDO wants it up before grading begins
A tree save area far from the land disturbanceThe UDO allows continuous rope or flagging there. That is yours to supply, since we don't rent it
Work along Center Street or Mebane Oaks RoadPanels on your side of the line. Anything in the right-of-way waits on an encroachment agreement with whoever controls the road. On state roads that is NCDOT; confirm which yours is
A corner lotAsk Planning whether the fence section's 10 by 70 ft sight triangle reaches a construction fence before we set the corner
A run beside a stream bufferAsk Planning before we set it; a Buffer Authorization Permit, if one applies, is yours to get
A storefront renovation downtownPanels on weighted stands inside your property line, with a logo screen printed by quote

Mebane sites

Mebane sites and
the fence each needs

A travel center at the interstate holds its fence into 2027. Storefront work on Clay Street suits panels for a shorter stretch. Each card names a Mebane site or rule, the fence we’d start from, and the reason.

Builders and owners

Fencing for builds and
downtown property

Near the interstate, a build that runs into 2027 calls for driven posts and a locked vehicle gate. Downtown, a storefront renovation fits panels that sit on pavement and lift out clean. Choose your tab.

Temporary fencing for Mebane builders: fence, gates, rules, install, sites like these, and where in Mebane.
The fenceInterstate builds that run into 2027 get driven posts carrying 6 or 8 ft chain link or panel fence.
GatesLocking vehicle and pedestrian gates and a privacy screen where you want one; any Knox box comes from you.
The rulePreserved trees and buffers fenced before grading begins, at least 4 ft high and outside the drip line, removed before the final site inspection.
InstallOur team sets the tree fence first, then drives the posts and hangs the gates. When the job ends, we pull the posts and backfill each hole.
Sites likeBuc-ee’s at Exit 152. Evolve on Mebane Oaks Road. The Walmart distribution center expansion, under construction as of April 2026.
Where in Mebane
  • Exit 152
  • Mebane Oaks Road
  • Commerce Park
Temporary fencing for Mebane downtown owners: fence, gates, screens, rules, jobs like these, and where in Mebane.
The fenceSections on weighted bases, 6×12 or 8×12 ft, for storefront work where digging isn’t an option.
GatesA pedestrian gate that locks, for a vacant storefront or a staging corner behind the building.
ScreensA privacy screen to hide renovation work, logo printed by quote.
The ruleA structure in a City street right-of-way needs an encroachment agreement through City Engineering; ask whether a temporary fence does.
Jobs likeStorefront renovations downtown. Staging yards. Vacant buildings waiting on work.
Where in Mebane
  • Clay Street
  • Center Street
  • Fifth Street

Trees, state roads, wraps

Mebane rules: trees,
NCDOT, wraps

These cards cover the penalties for damaging vegetation the UDO protects and the state roads NCDOT controls. The last one covers what state law lets a fence wrap say.

For trees

Penalties for vegetation damage

Damaging vegetation in a required buffer or landscape area is a violation. The Zoning Administrator can order the whole site revegetated. Failing to substantially comply with Section 6-4 revokes the zoning or special use permit. Violators face the maximum civil penalty the law allows, and each uncorrected day is a separate offense.

For state roads

State roads and NCDOT agreements

NCDOT plans label Center Street as US 70 and show Mebane Oaks Road as state-maintained. Confirm a road with NCDOT. Construction in NCDOT’s right-of-way needs an encroachment agreement through the District Office, and bonds may be required. Alamance and Orange share one division office in Greensboro.

For signs

Fence-wrap signs

Mebane exempts fence-wrap signs that follow G.S. 160D-908. The exemption lasts until the certificate of occupancy for the final portion or 24 months after the wrap went up, whichever is shorter. The wrap stays exempt only if its ads come from someone directly involved in the project and no one is paid for the ad. We print logo screens by quote.

From the Mebane yard

How install and pickup
work in Mebane

Mebane is our headquarters town, with Smithfield as backup. Being close doesn’t change the promise: order by 4 PM and the fence goes in next day, and our team comes back to pull it when you call.

Primary dispatch

130 N Gibson Rd

From the Gibson Road yard to City Hall is about five minutes. Order by 4 PM and the panels, posts, gates and screens on your order are set next day.

On site

Tree fence, then the perimeter

Where a plan preserves trees or buffers, the UDO wants the tree fence up before grading begins, so it goes on your first order. Our crew sets it at the line you and the Zoning Administrator locate. The perimeter follows outside it, and the UDO bars attaching anything to a tree that stays.

Pickup

Tree fence removal and pickup

The UDO keeps tree fencing up until all site work is completed and requires it removed before the final site inspection for the certificate of occupancy. The rental extends with no re-booking until then; call, and we pull the posts and backfill.

Mebane fencing FAQ

Mebane fence
rental questions

These answers cover tree fencing, permits, corner lots, events and the two counties. They come from the UDO, City web pages, the City’s fee schedule and NCDOT. Where the rules are silent, we say so and name the office to ask.

Will you put up the tree fence Mebane's UDO asks for?

Yes. The UDO wants a sturdy, visible fence of durable construction, at least 4 feet high and outside the drip line. It must be up before grading begins and removed before the final site inspection for the certificate of occupancy. Send the plan sheets; we set the tree fence, and the City judges it. The required signs are yours.

Which Mebane projects fall outside the tree fence rule?

Section 6-4's exemptions include a detached single-family home or two-family dwelling on its own lot. Existing uses and buildings are exempt, among them repairs or alterations that don't add on or expand. So are additions of 35% or less of existing floor area in any 12 months, and parking expansions of 35% or less.

Will the City want a permit for my construction fence?

Not stated. The fence section says nothing in it precludes temporary fences around construction works under the NC Building Code or erosion and sedimentation control requirements. The City's fence permit FAQ addresses yard fences. A zoning permit is $50. Ask the Planning Department at (919) 563-9990; any permit is yours to pull.

Can my fence run to a corner or across an easement?

On a corner lot, the fence section requires a sight triangle 10 feet from the right-of-way and 70 feet along each side when designing a fence. Whether that binds a temporary construction fence isn't stated, so ask Planning. Separately, the UDO lets fences without foundations be located in utility easements.

When do driven posts beat panels on a Mebane site?

Posts earn their keep on anything lasting past a season. Buc-ee's plans to open in November 2027. A build that long suits 6 or 8 ft chain link or panel fence driven into the ground. Downtown, 6x12 or 8x12 ft panels sit on weighted stands with nothing dug. Both take locking gates.

Your yard is in Mebane. Does that change the timing?

The promise stays next day on orders by 4 PM. Our headquarters yard at 130 N Gibson Rd is about five minutes from City Hall, so an order placed early can sometimes go out the same day; call to check. Smithfield is the backup yard, and a dumpster or restrooms can ride the order.

Can you fence an event in Mebane?

Yes, where your event layout puts panels, but ask the City first: we found no City event or barricade rule online. On private property in certain office, business and industrial districts, a temporary event permit runs up to 14 days. Under that permit, every structure must be portable and gone when it ends.

Does it matter which county my Mebane site sits in?

Not for the fence rules: the City's UDO governs its jurisdiction in both Alamance and Orange counties, and one NCDOT division office serves both. Erosion control splits, though. For sites on the Alamance side, the City points to the state's erosion and sediment control page. For the Orange side, it points to Orange County's Erosion Control and Stormwater page.

Get a fence quote for
your Mebane site

Send the Mebane address, the footage, the gates, how long the build runs, and the landscape and grading sheets that show tree fencing. We’ll pick panels or posts, add the tree fence, and set it next day on orders by 4 PM. Permits and any Knox box stay with you.