Where the trailer loads
Plan on filling the trailer on your lot or at your dock, not in the street. When you call, tell us where on your site it will sit while your crew loads it. Ask the Town how its rules apply to your site.
Services
Ready to book?
Orders placed by 4:00 PM are delivered the next business day. Free quote either way — just get in touch.
Get a quoteCentral NC
Thirty-eight towns.
Eleven counties.
Wake County
Guilford County
Alamance County
Johnston County
Orange County
Chatham County
Forsyth County
Harnett County
Durham County
Lee County
Randolph County
Construction + Industrial · Walking Floor Trailers · Jamestown, NC
A walking floor trailer empties itself: hydraulic slats in its floor push the load out horizontally. It holds about 120 cubic yards, four times a standard 30-yard dumpster. Your crew loads it over the top, at a dock or live by excavator. It leaves our Mebane yard, about fifty-five minutes away, with Smithfield as backup.
The trailer holds about 120 cubic yards of building, roofing, cleanout or clearing waste from a Jamestown job. Load it over the top, at a dock or by excavator. We dispatch it from our Mebane yard, about fifty-five minutes away.

Loading, waste, truck routes
Settle three things before a Jamestown trailer arrives: where it sits while your crew loads it, which waste can share it and how the Town’s truck-route rule fits your site. Each card says what to plan and who to ask.
Plan on filling the trailer on your lot or at your dock, not in the street. When you call, tell us where on your site it will sit while your crew loads it. Ask the Town how its rules apply to your site.
State law (G.S. 130A-290) leaves land-clearing, inert and yard debris out of its definition of construction and demolition (C&D) waste. If a Jamestown job turns up building debris and stumps or brush, plan a separate haul for each where you can. Tell us what is going in when you call.
Jamestown’s Town Code makes state-maintained streets the truck routes for tractor-type trucks pulling semi-trailers. It says tractor-type trucks may not “park on or off the street in a non-truck traffic route (i.e., residential neighborhood)”. Ask the Town how the rule applies to your site.
Haul by job
Each row pairs a kind of Jamestown job with the haul we’d suggest. The first five rows end at the walking floor trailer, and four of them name a way to load it. The last row covers a pile one 30-yard dumpster can hold.
| Your Jamestown job | The haul |
|---|---|
| Building or teardown debris that would overflow one dumpster | The walking floor trailer, which holds about 120 cubic yards |
| Pallets or bulky waste at a plant or warehouse dock | The trailer, backed into your dock with a dock plate for a forklift or pallet jack |
| Stumps, limbs and brush from a clearing job | The trailer, positioned with your crew for live loading by excavator |
| Shingles, debris and insulation board from a tear-off | The trailer, loaded over the top |
| Mulch, wood waste or bulk recyclables | The trailer, top-loaded; its moving floor pushes the load out when it unloads |
| A pile one 30-yard dumpster can hold | Probably a dumpster, since the trailer holds about four times as much |
Jamestown jobs
Five kinds of work, each with how the trailer loads for it and the rule to plan around. The builds tab below names one Jamestown site.
New-build, remodel and teardown debris
Top load or excavator
Debris from building, remodeling and teardowns goes in over the top, or by excavator on a larger demolition. Town staff won’t collect a professional contractor’s building debris; the contractor is responsible for disposal. Tell us what is in the load.
Shingles, debris, insulation board
Top load
Shingles, debris and insulation board from a tear-off go in over the top. Clean, source-separated shingles can be recycled under state guidance, so keep a shingle-only load apart. Removing more than 160 square feet of friable asbestos roofing needs a state permit.
Pallets, bulky waste, recyclables
Dock and dock plate
We can back our trailer into a loading dock with a dock plate, and a small forklift or pallet jack loads it. State law bars anyone from knowingly disposing of wooden pallets in a landfill, except one permitted to accept only C&D debris.
Stumps, limbs, brush, wood waste
Excavator live-load
On a clearing job, an excavator loads the trailer live. Jamestown’s Land Development Ordinance (LDO) calls for a Tree Disturbance Permit from the Town’s Planning Director before most land-disturbing activity or tree removal. Where a plan counts trees in a Tree Conservation Area for credit, parking and material storage are barred inside it, so plan the trailer’s spot outside it.
Bulk recyclables, transfer loads
Top load
Bulk recyclables and transfer station loads go in over the top, and the moving slats push them out horizontally when the trailer unloads. State rules define inert debris waste as only asphalt, cured concrete, brick, concrete block, gravel and rock. Tell us what the load holds when you book.
By type of work
Builds, demolition and roofing load over the top or by excavator. Plant cleanouts load at a dock, and land clearing by excavator. Each tab lists what comes before work and sites like it.
| The haul | One trailer that holds about 120 cubic yards, with the exact capacity in your quote. |
|---|---|
| Loading | Loose debris and tear-off go in over the top. For excavator loading, our team coordinates with your crew to position the trailer. |
| Materials | Construction and demolition waste, plus shingles, debris and insulation board from roof tear-offs. |
| Before work | Development the Town’s LDO regulates needs the Town’s Development Clearance Certificate (DCC) first. Most projects also need Guilford County permits, such as building, plumbing or electrical. State rules call for an asbestos inspection before any demolition or renovation. A demolition also needs notice to the state’s Health Hazards Control Unit at least 10 working days ahead. |
| Sites like | New-home sites like D.R. Horton’s Kinsley on Mackay Road. At a March 12, 2026 Town Council work session, D.R. Horton’s land acquisition manager said it had started 25 single-family homes and nine townhomes there. |
| The haul | The same trailer, priced by the load or by the hour, with a free estimate. |
|---|---|
| Loading | For a forklift or pallet jack, we can back it into your dock with a dock plate. On a clearing job, our team coordinates with your crew to position it for the excavator. |
| Materials | From a plant: palletized or bulky materials, industrial waste and recyclables. From clearing: land-clearing debris, mulch and wood waste. |
| Before work | The land-clearing card above covers the Town’s Tree Disturbance Permit, and the rules cards below cover erosion control and stream buffers. Getting plans and permits is up to you or the owner. |
| Sites like | Any plant or warehouse with a loading dock, or land being cleared before building. |
Jamestown’s rules
The streets card rests on the Town’s posted Code, current through July 2018, and the other two on the Town’s LDO and Guilford County’s program. Each card says what that means for the trailer and who to ask. Permits are yours or the owner’s to get.
Load on your lot or at your dock, not in the street. Jamestown’s Town Code bars operating or parking a vehicle so that it obstructs vehicle or pedestrian traffic, or parking so as to block a sidewalk, private driveway or crosswalk. The truck-route card above reaches parking off the street too, so ask the Town how both apply to your site.
Guilford County runs the erosion control program for most Jamestown projects. Most land-disturbing activity that exceeds one acre needs an approved erosion control plan and a grading permit. Under an acre, work in Tier 1 or Tier 2 of a watershed critical area can still need a plan. Ask the County’s Soil Erosion Control Section what your site needs.
In a water supply watershed, Jamestown’s LDO keeps a buffer at least 50 feet wide beside streams, lakes, reservoirs, ponds and specified ditches for most work. The inner 30 feet stays undisturbed except for uses the LDO allows. Keep the trailer out of any buffer, and ask the Town whether your site needs its Buffer Authorization.
Loading and pickup
The trailer comes from our Mebane yard, about fifty-five minutes away. Your crew loads it on your lot or at your dock, then calls us for pickup.
Jamestown hauls leave our Mebane yard, about fifty-five minutes from town, and Smithfield backs it up. When you call, have the site address, the material and your loading method ready.
We can back our trailer into a loading dock with a dock plate, so tell us where your dock is when you book. Where the LDO requires off-street loading areas, it wants loading and unloading maneuvers on private property. On a clearing job, our team coordinates with your crew to position the trailer.
When the trailer is full, call us to coordinate a pickup time and we’ll be there. We take calls Mon – Fri · 7:30 AM – 4:30 PM, and we’re closed Saturday and Sunday. If the job will fill the trailer more than once, say so when you book.
Jamestown trailer FAQ
Answers on capacity, a Jamestown site with no room to load, what to tell us about a load, pricing, weekends, land clearing and dumpsters. If yours isn’t here, call before you book.
About 120 cubic yards, four times a standard 30-yard dumpster. Capacity can vary with how the trailer is configured, and your quote gives the exact figure.
Call us before you book, and plan on your lot or a dock, not the street. Jamestown’s Town Code says tractor-type trucks may not “park on or off the street in a non-truck traffic route (i.e., residential neighborhood)”. Ask the Town how its rules apply to your site.
The material, roughly how much there is, and how it loads: over the top, at a dock or by excavator. Point out anything you can’t identify. Mention discarded computer equipment or televisions, since state law bars anyone from knowingly disposing of them in a landfill.
By the load or by the hour, and the estimate is free. Tell us the material, about how much there is and how it will load, and we’ll quote the haul.
No. We’re closed Saturday and Sunday. Call Monday through Friday to book a trailer or arrange a pickup.
Yes. An excavator can load stumps, limbs and brush live, and mulch and wood waste go over the top. Clearing is land-disturbing activity, so check the land-clearing, erosion and stream buffer cards above. Getting plans and permits is up to you or the owner.
Yes. If one 30-yard dumpster can hold the pile, a dumpster may be the easier haul. Our Jamestown dumpster page lists the sizes, or call and we’ll help you choose.
Also in Jamestown
When the pile fits one dumpster, a dumpster may be the better haul. Restrooms, handwashing stations, fencing and more come from our Mebane yard, backed by Smithfield, on the same phone number. Each card links to its Jamestown page where one exists.
Send the Jamestown site address, the material and how you’ll load it: over the top, at a dock or by excavator. The quote prices the haul and states the trailer’s exact capacity.