Where the trailer loads
Plan on filling the trailer on your lot or at your dock, not in the street or on its shoulder. The Town keeps its full set of ordinances at Town Hall, so ask there how its rules apply to your site.
Services
Ready to book?
Orders placed by 4:00 PM are delivered the next business day. Free quote either way — just get in touch.
Get a quoteCentral NC
Thirty-eight towns.
Eleven counties.
Wake County
Guilford County
Alamance County
Johnston County
Orange County
Chatham County
Forsyth County
Harnett County
Durham County
Lee County
Randolph County
Construction + Industrial · Walking Floor Trailers · Whitsett, NC
Hydraulic slats in the floor of a walking floor trailer push the load out horizontally, so it unloads itself. The trailer holds about 120 cubic yards, four times a standard 30-yard dumpster. Your crew loads it over the top, at a dock or live by excavator. We dispatch it from our Mebane yard, about twenty-five minutes away, with Smithfield as backup.
For a Whitsett job, the trailer holds about 120 cubic yards of debris, tear-off, cleanout or clearing waste. Fill it over the top, at a dock or by excavator. It comes from our Mebane yard, about twenty-five minutes away.

Loading, waste, demolition
Settle three things before a Whitsett haul: where the trailer fills, which waste shares a load and, if a building is coming down, the demolition permit. Each card says what to plan and who to ask before the trailer arrives.
Plan on filling the trailer on your lot or at your dock, not in the street or on its shoulder. The Town keeps its full set of ordinances at Town Hall, so ask there how its rules apply to your site.
State law (G.S. 130A-290) leaves land-clearing, inert and yard debris out of its definition of construction and demolition (C&D) waste. So where you can, load building debris apart from stumps and brush. When you call, tell us what each load holds.
By contract, Guilford County’s Inspections Department provides permitting for Whitsett, and demolishing a building takes its demo permit. Inside Whitsett, the Town’s Development Clearance Certificate (DCC) comes first, signed by an authorized Town of Whitsett official. Getting both is up to you or the owner.
Haul by job
Six common kinds of Whitsett job, each matched with the haul we’d suggest. Five end at the walking floor trailer, and four of those say how it loads. The sixth row is for a pile that one 30-yard dumpster can hold.
| Your Whitsett job | The haul |
|---|---|
| Teardown or building debris too big for one dumpster | The walking floor trailer, which holds about 120 cubic yards |
| Pallets or bulky waste at a plant or warehouse with a dock | The trailer, backed into your loading dock with a dock plate for a forklift or pallet jack |
| Stumps, limbs and brush from clearing land | The trailer, positioned with your crew so an excavator can load it live |
| Shingles, debris and insulation board from a roof tear-off | The trailer, filled over the top |
| Mulch, wood waste or bulk recyclables | The trailer, top-loaded and emptied by its moving floor |
| A pile that fits in one 30-yard dumpster | A dumpster is likely simpler, since the trailer holds about four times as much |
Whitsett jobs
Each card covers one kind of work, how the trailer loads for it and the rule to plan around. The builds tab below names one Whitsett site.
New-build, remodel and teardown debris
Top load or excavator
Debris from new builds, remodels and teardowns goes in over the top, or by excavator on a bigger demolition. Tearing down a building takes the County’s demo permit, and inside Whitsett’s town limits the Town’s DCC comes first. Tell us what the load holds.
Shingles, debris, insulation board
Top load
Tear-off shingles, debris and insulation board load over the top. Clean, source-separated shingles can be recycled under state guidance, so keep a shingle-only load apart. Removing more than 160 square feet of friable asbestos roofing takes a state permit.
Pallets, bulky waste, recyclables
Dock and dock plate
At a plant or warehouse, we can back our trailer into a loading dock with a dock plate, and a small forklift or pallet jack loads it. State law bars knowingly landfilling wooden pallets, except in a landfill permitted to take only C&D debris.
Stumps, limbs, brush, wood waste
Excavator live-load
On a clearing job, an excavator loads stumps, limbs and brush live. Where a project keeps trees for planting-yard credit, parking and material storage aren’t permitted within their canopy drip line, so plan the trailer’s spot outside it. A proposed tree buffer ordinance updating that rule was introduced at the Council’s August 11, 2026 meeting.
Bulk recyclables, transfer loads
Top load
Bulk recyclables and transfer station loads go in over the top, and the moving floor pushes them out when the trailer unloads. State rules limit inert debris to asphalt, cured concrete, brick, concrete block, gravel and rock. Say what the load holds when you book.
By type of work
Builds, demolition and roofing load over the top or by excavator. Plant cleanouts load at a dock, and clearing by excavator. Each tab lists what comes before work and sites like it.
| The haul | One trailer that holds about 120 cubic yards, with the exact capacity in your quote. |
|---|---|
| Loading | Loose debris and tear-off go in over the top. For an excavator, our team coordinates with your crew to position the trailer. |
| Materials | Construction and demolition waste, and shingles, debris and insulation board from roof tear-offs. |
| Before work | Most development that needs a permit, such as a building or grading permit, needs the Town’s Development Clearance Certificate (DCC) first. Guilford County then issues the other permits. State rules call for an asbestos inspection before any demolition or renovation, and a demolition needs notice to the state’s Health Hazards Control Unit at least 10 working days ahead. Permits are yours or the owner’s to get. |
| Sites like | Townhome construction like Hudson Way. In March 2026, Planning Board minutes reported that Keystone had Town DCCs for the first six units. Town Council minutes for May 12, 2026 say initial foundation work was under way. |
| The haul | The same trailer, priced by the load or by the hour, with a free estimate. |
|---|---|
| Loading | For a forklift or pallet jack, we can back it into your dock with a dock plate. On clearing work, our team coordinates with your crew to position it for the excavator. |
| Materials | From a plant: palletized or bulky materials, industrial waste and recyclables. From clearing: land-clearing debris, mulch and wood waste. |
| Before work | The rules cards below cover erosion control, grading and stream buffers. Plans and permits are yours or the owner’s to get. |
| Sites like | Any plant or warehouse with a loading dock, or land being cleared before a build. |
Whitsett’s rules
The street card rests on state law, and the Town keeps its full ordinances at Town Hall. The other two use the Town’s posted Development Ordinance, effective June 13, 2023. Each card says what that means for the trailer and who to ask. Permits are yours or the owner’s to get.
Load on your lot or at your dock, not in the street or on its shoulder. State law bars leaving a vehicle standing on a street’s main-traveled portion unless it is so disabled that stopping can’t be avoided. Ask Town Hall how the Town’s own rules apply to your site.
Guilford County runs the erosion control program for most Whitsett projects. Most land disturbance over an acre needs an approved erosion control plan and a grading permit. Under an acre, some work, such as Tier 1 or Tier 2 work in a watershed critical area, can still need a plan. A grading permit needs the Town’s DCC first. Ask the County’s Soil Erosion Control Section what your site needs.
In the Town’s watershed areas, the ordinance keeps a buffer of at least 30 or 100 feet along perennial waters, and bars most new development in it. In the Jordan Lake watershed, Guilford County must grant Buffer Use Authorization before construction in streamside zones. Keep the trailer out of any buffer, and ask the County for a free stream buffer determination.
Loading and pickup
The trailer comes from our Mebane yard, about twenty-five minutes away. Your crew fills it on your lot or at your dock, then calls us for pickup.
Whitsett hauls go out from our Mebane yard, about twenty-five minutes from town, with Smithfield as the backup yard. Have the site address, the material and your loading method ready when you call.
We can back our trailer into a loading dock with a dock plate, so tell us where your dock is when you book. Where the Town requires off-street loading areas, loading maneuvers stay on private property. On a clearing job, our team coordinates with your crew to position the trailer.
Once the trailer is full, call us to coordinate a pickup time and we’ll be there. We take calls Mon – Fri · 7:30 AM – 4:30 PM and are closed Saturday and Sunday. If the job will fill the trailer more than once, tell us when you book.
Whitsett trailer FAQ
Seven answers: capacity, a Whitsett site with no room to load, the load, pricing, weekends, land clearing and dumpsters. Call before you book if yours isn’t here.
About 120 cubic yards, or four times a standard 30-yard dumpster. Capacity can vary by configuration, so your quote states the exact figure.
Call us before you book. Plan on your lot or a dock, not the street or its shoulder. State law bars leaving a vehicle standing on a street’s main-traveled portion unless it is so disabled that stopping can’t be avoided. The Town keeps its full ordinances at Town Hall, so ask there how its rules apply to your site.
The material, roughly how much there is, and how it loads: over the top, at a dock or by excavator. Point out anything you can’t identify. Mention any discarded computer equipment or televisions, since state law bars knowingly landfilling them.
By the load or by the hour, and estimates are free. Give us the material, a rough amount and the loading method, and we’ll quote the haul.
No. We’re closed Saturday and Sunday, so call Monday through Friday to book a trailer or arrange a pickup.
Yes. An excavator loads stumps, limbs and brush live, and mulch and wood waste go in over the top. Clearing is land-disturbing activity, so check the erosion and stream buffer cards above. Plans and permits are yours or the owner’s to get.
Yes. When one 30-yard dumpster can take the pile, a dumpster may be the simpler haul. Our Whitsett dumpster page lists the sizes, or call and we’ll help you choose.
Also in Whitsett
A pile that fits one dumpster may not need a trailer at all. Portable restrooms, handwashing stations, fencing and the rest also come from our Mebane yard, with Smithfield as backup, on one phone number. Each card links to its Whitsett page where one exists.
Send the Whitsett site address, what you’re hauling and how it will load: over the top, at a dock or by excavator. We’ll price the haul and give the trailer’s exact capacity in the quote.