Construction + Industrial · Walking Floor Trailers · Rolesville, NC

Walking floor trailers
in Rolesville, NC.

In Rolesville, the trailer holds about 120 cubic yards of building, tear-off, cleanout or clearing debris. Fill it from the top, at a dock or by excavator. It comes from our Smithfield yard, about an hour away.

  • DispatchSmithfield yard (~60 min)
  • CapacityAbout 120 cu yd
  • LoadingTop · Dock · Excavator
  • HoursMon – Fri · 7:30 AM – 4:30 PM
WasteAway's walking floor trailer for Rolesville, NC hauls

Where, what, when

What the rules mean for
your Rolesville trailer

Three things shape a Rolesville walking floor job: where the trailer fills, how the waste splits between hauls, and what hours the noise ordinance sets for construction. Each card says what to do and who to ask.

Where it loads

Where the trailer loads

Plan to fill the trailer at a dock or on your lot, not in the street. Rolesville’s Land Development Ordinance (LDO) bars vehicles and trailers at least 80 inches wide or 30 feet long from parking on streets inside town limits, apart from listed exceptions. The same section says: “Trailers shall not park in rights-of-way”.

What rides together

Keeping waste streams apart

North Carolina treats construction and demolition (C&D) waste as its own stream, and G.S. 130A-290 leaves land-clearing, inert and yard debris out of it. When a job has both, keep tear-out debris on one haul and stumps and brush on another. Tell us what the loads will hold when you call.

Noise rules

Construction noise hours

In residential and business zoning districts, Rolesville’s noise ordinance bars construction activity, including demolition and land clearing, outside 8 a.m. to 6 p.m., except emergency work. It also bars plainly audible unreasonable noise from loading or unloading a vehicle. Ask the Town before early or late work.

Haul by job

Which haul fits
your Rolesville job

Look up your Rolesville job in the left column and read the haul beside it. Five rows send the work to the walking floor trailer, and four of them say how to load it. The last row covers a pile that one 30-yard dumpster can hold.

The haul that suits each kind of Rolesville job
Your Rolesville jobThe haul
Demolition or tear-out debris too big for one dumpsterThe walking floor trailer, which holds about 120 cubic yards
Pallets or bulky waste at a plant or warehouse dockThe trailer, backed into your dock with a dock plate so a forklift or pallet jack can load it
Stumps, limbs and brush on a lot being clearedThe trailer, placed with your crew where the excavator can load it live
Shingles, debris and insulation board from a tear-offThe trailer, loaded over the top
Mulch, wood waste or bulk recyclablesThe trailer, filled from the top and unloaded by its moving slats
A pile that one 30-yard dumpster can holdLikely a dumpster; the trailer holds about four times as much

Rolesville jobs

Rolesville jobs
a walking floor fits

Each card covers one kind of work the trailer hauls and how it loads. The construction and land-clearing cards name Rolesville projects as the Town describes them. Neither is our job.

By type of work

Hauling for builds,
plants and land clearing

Pick the tab for your Rolesville work. Builds and roofs load from the top or by excavator, plants at a dock, and clearing jobs by excavator. Each tab lists what to settle before work starts.

Walking floor hauling for Rolesville builds and demolition: the haul, loading, materials, a step before work, and sites like these.
The haulThe trailer holds about 120 cubic yards. Your quote gives the exact capacity for its configuration.
LoadingLoose debris and tear-off go in over the top. For excavator loading, our team and your crew position the trailer first.
MaterialsConstruction and demolition waste, plus roof tear-offs: shingles, debris and insulation board.
Before workState rules call for an accredited asbestos professional to inspect a building before any demolition or renovation. A demolition also needs notice to the state’s Health Hazards Control Unit at least 10 working days ahead. For site plans with a structure on site, the Town’s checklist asks for a Wake County demolition permit.
Sites likeCommercial lots in Wallbrook listed for Chase Bank and Chipotle on S. Main St., where the Town says construction began in March 2026.
Walking floor hauling for Rolesville plants, warehouses and land clearing: the haul, loading, materials, a step before work, and sites like these.
The haulThe same trailer, priced by the load or by the hour, with a free estimate.
LoadingBacked into your dock with a dock plate for a forklift or pallet jack. On a clearing job, positioned with your crew within the excavator’s reach.
MaterialsPalletized or bulky materials, industrial waste and recyclables, along with land-clearing debris, mulch and wood waste.
Before workClearing is land disturbance, so the erosion card below applies, and the tree removal card may too. Permits are yours or the owner’s to get.
Sites likeAny plant or warehouse with a loading dock, or land being cleared for building.

Rolesville’s rules

Rolesville rules:
streets, erosion, clearing

Three rules shape where a Rolesville trailer sits and when clearing starts: streets, erosion control and tree removal. Each card says what the rule means for your trailer and who to ask. Permits are yours or the owner’s to get.

For streets

Streets and staging

Keep the trailer at a dock or on your lot, not in the street. For projects that go through the Town’s pre-construction process, its checklists call for an on-site staging area and on-site parking, and say parking on public streets is not permitted. Settle the trailer’s spot at that meeting, or with us when you book.

Before disturbing land

Erosion control

Wake County, not the Town, issues land disturbance permits in Rolesville. For a residential subdivision, the Town’s checklist says site work can’t start until the County has issued one. Wake County’s residential lot page says builders need one in a subdivision at any size, and outside one when disturbance is greater than one acre. Ask Wake County Environmental Services what your site needs.

Before clearing

Tree removal and protection

Rolesville’s LDO calls for an approved tree removal permit or preservation plan before trees are cut, removed or relocated, apart from a few exemptions such as dead or fallen trees. Developments of two acres or more must keep at least 10 percent of their healthy existing trees. Properties in the Downtown Overlay are exempt from these tree rules. Ask the Planning Department how the permit applies to your lot.

Loading and pickup

How loading and pickup
work in Rolesville

Call to book a Rolesville haul. We dispatch the trailer from our Smithfield yard, about an hour away. Our Mebane yard backs it up. Load it the way your site works, then call us to coordinate a pickup time.

Primary dispatch

258 County Home Rd

Rolesville trailers go out from our Smithfield yard, about an hour from Town Hall, with Mebane as backup. When you call, have the site address, what the load holds and how you’ll fill it.

On site

Loading day

At a dock, we can back our trailer in with a dock plate. On a clearing job, our team works with your crew to set the trailer where the excavator can reach it. Either way, it sits on the lot, not in the street.

Pickup

Pickup and more loads

Once the trailer is full, call us to coordinate a pickup time, and we’ll be there. Our hours are Mon – Fri · 7:30 AM – 4:30 PM, and we’re closed on weekends. If the job needs more than one load, tell us when you book.

Rolesville trailer FAQ

Rolesville walking
floor trailer questions

Answers on capacity, Rolesville sites with no room to load, what to tell us about a load, pricing, weekends, land clearing and dumpsters. If your question isn’t here, call us before you book.

How much does a walking floor trailer hold?

About 120 cubic yards, or four times a standard 30-yard dumpster. The exact capacity depends on the trailer’s configuration, and your quote gives it.

What if our Rolesville site has no room to load?

Call us before you book. The trailer fills at a dock or on your lot, not in the street, so we’ll talk through where it can sit and how you’ll load it.

What should I tell you about the load?

The material, about how much there is, and how it will go in: over the top, at a dock or by excavator. Flag anything you can’t identify. Mention discarded computer equipment or televisions too, since state law bars anyone from knowingly disposing of them in a landfill.

How is a walking floor haul priced?

By the load or by the hour, with a free estimate. Give us the material, the volume and the loading method, and we’ll quote the haul.

Do you haul on weekends?

No. We’re closed on weekends. Call Monday through Friday to book the trailer or arrange a pickup.

Do you haul land-clearing debris in Rolesville?

Yes. An excavator can load stumps, limbs and brush live, and mulch goes in over the top. Clearing can need a Wake County land disturbance permit and the Town’s tree removal permit, so check the rules cards. Those permits are yours or the owner’s to get.

Do you rent dumpsters in Rolesville too?

Yes. A pile that fits in one 30-yard dumpster may be better in a dumpster. Our Rolesville dumpster page lists the sizes, or call and we’ll compare the two.

Get a walking floor
quote in Rolesville

Tell us the Rolesville site address, what the load holds and how it will go in: over the top, at a dock or by excavator. We’ll price the haul and confirm the trailer’s exact capacity.