Construction + Industrial · Walking Floor Trailers · High Point, NC

Walking floor trailers
in High Point, NC.

For a High Point job, the trailer takes about 120 cubic yards of building, roofing, cleanout or clearing waste. Fill it over the top, at a dock or by excavator. It leaves our Mebane yard, about an hour away.

  • DispatchMebane yard (~60 min)
  • CapacityAbout 120 cu yd
  • LoadingTop · Dock · Excavator
  • HoursMon – Fri · 7:30 AM – 4:30 PM
WasteAway's walking floor trailer for High Point, NC hauls

Loading, waste, demolition

What the rules mean for
your High Point trailer

Settle two things before a High Point trailer arrives: where it sits while your crew loads it and which waste can share it. A teardown adds a third, the City’s demolition permit. Each card says what to plan and who to ask.

Where it loads

Where the trailer loads

Plan on filling the trailer on your lot or at your dock, not in the street. When you call, tell us where on your site it will sit while your crew loads it. Ask the City how its rules apply to your site.

What rides together

Keeping waste streams apart

State law (G.S. 130A-290) leaves land-clearing, inert and yard debris out of its definition of construction and demolition (C&D) waste. If a High Point job turns up building debris and stumps or brush, plan a separate haul for each where you can. Tell us what is going in when you call.

Before a teardown

Demolition permits

The City permits teardowns of residential and commercial structures through its Structure Removal process, and its Development Services Center issues the Demolished Structure Permit. In a local historic district, or for a Guilford County Historic Landmark, a Certificate of Appropriateness comes first. Ask the Development Services Center what your teardown needs.

Haul by job

Which haul fits your
High Point job

Each row starts with a kind of High Point job and ends with the haul we would suggest. The first five rows lead to the walking floor trailer, and four of those name a loading method. The sixth row is for a pile one 30-yard dumpster can hold.

The haul that suits each kind of High Point job
Your High Point jobThe haul
Building or demolition debris too big for one dumpsterThe walking floor trailer, which holds about 120 cubic yards
Pallets or bulky waste waiting at a plant or warehouse dockThe trailer, backed into your dock with a dock plate so a forklift or pallet jack can fill it
Stumps, limbs and brush from clearing a siteThe trailer, positioned with your crew so an excavator can load it live
Shingles, debris and insulation board from a roof tear-offThe trailer, loaded over the top
Mulch, wood waste or bulk recyclablesThe trailer, loaded over the top; its moving floor pushes the load out at unloading
A pile that one 30-yard dumpster can holdLikely a dumpster, since the trailer holds about four times as much

High Point jobs

High Point jobs
a walking floor fits

Each card covers one kind of work the trailer hauls and how it loads. The cards describe the work, not a site, and the builds tab below names two High Point sites of that kind.

By type of work

Hauling for builds,
plants and land clearing

High Point work falls into two tabs: builds, demolition and roofing, then plant cleanouts and land clearing. Each tab gives the haul, loading, materials, a step before work and sites of that kind.

Walking floor hauling for High Point builds and demolition: the haul, loading, materials, a step before work, and sites like these.
The haulOne trailer that holds about 120 cubic yards. Your quote gives the exact capacity for how it is configured.
LoadingLoose debris and tear-off go in over the top. When an excavator loads, our team coordinates with your crew to position the trailer.
MaterialsConstruction and demolition waste, and shingles, debris and insulation board from roof tear-offs.
Before workState rules call for an asbestos inspection before any demolition or renovation begins. A demolition also needs notice to the state’s Health Hazards Control Unit at least 10 working days ahead.
Sites likeCampus builds like High Point University’s Charman Library, which HPU said on July 16, 2026 was about half complete. Building conversions like Showplace West on South Main Street, which LBD Investments bought to turn into apartments. WFDD reported on April 15, 2026 that the developer had already started demolition.
Walking floor hauling for High Point plants, warehouses and land clearing: the haul, loading, materials, a step before work, and sites like these.
The haulThe same trailer, priced by the load or by the hour, with a free estimate.
LoadingFor a forklift or pallet jack, we can back it into your dock with a dock plate. On a clearing job, our team coordinates with your crew to position it where the excavator can reach.
MaterialsFrom a plant: palletized or bulky materials, industrial waste and recyclables. From clearing: land-clearing debris, mulch and wood waste.
Before workThe land-clearing card above covers trees on City land, and the rules cards below cover erosion control and stream buffers. Getting plans and permits is up to you or the owner.
Sites likeAny plant or warehouse with a loading dock, or land being cleared before building.

High Point’s rules

High Point rules:
streets, erosion, buffers

The streets card rests on the City’s right-of-way pages, and the other two on its Development Ordinance, amended through July 21, 2025. Each card says what that means for the trailer and who to ask. Permits are yours or the owner’s to get.

For streets

Streets and sidewalks

Load on your lot or at your dock, not in the street. The City says any lane or sidewalk closure along public streets in its corporate limits takes a Lane Closure Permit from its Transportation Department. Any disturbance of City streets, curb and gutter, or sidewalk takes a separate Right-of-Way Disturbance permit from Engineering Services. Ask those offices about your site.

Before disturbing land

Erosion control

High Point runs its own erosion control program for most projects in its city limits and extraterritorial jurisdiction. Most land disturbance of more than an acre needs an erosion control plan and a land disturbance permit, and some smaller sites need them too. At any size, take all reasonable measures to protect public and private property from damage. Ask the City what your site needs.

Near streams

Stream buffers

For most work, High Point’s Development Ordinance keeps a buffer at least 50 feet wide on all sides of perennial and intermittent streams, lakes and ponds. The inner 50 feet stays undisturbed except as the rules allow. Keep the trailer out of any buffer, and ask the City what your site needs.

Loading and pickup

How loading and pickup
work in High Point

The trailer comes from our Mebane yard, about an hour away. Your crew loads it on your lot or at your dock, then calls us for pickup.

Primary dispatch

130 N Gibson Rd

High Point hauls go out from our Mebane yard, about an hour from the city, and Smithfield backs it up. When you call, have the site address, the material and your loading method ready.

On site

Loading day

We can back our trailer into a loading dock with a dock plate. When you book, tell us where your dock or loading area is. On a clearing job, our team coordinates with your crew to position the trailer. If your lot looks too tight, call before you book.

Pickup

Pickup and more loads

Once the trailer is full, call us to coordinate a pickup time and we’ll be there. We take calls Mon – Fri · 7:30 AM – 4:30 PM and are closed Saturday and Sunday. If the job will fill the trailer more than once, tell us when you book.

High Point trailer FAQ

High Point walking
floor trailer questions

Answers on capacity, a High Point site with no room to load, what to tell us about a load, pricing, weekends, land clearing and dumpsters. If your question isn’t here, call before you book.

How much does a walking floor trailer hold?

About 120 cubic yards, four times a standard 30-yard dumpster. The exact figure depends on how the trailer is configured, and your quote states it.

What if our High Point site has no room to load?

Call us before you book, and plan on your lot or a dock, not the street. Closing a lane or sidewalk along a public street in the city limits takes a City permit, and so does disturbing a City street, curb or sidewalk. The streets card above names both, so ask those offices how they apply to your site.

What should I tell you about the load?

What the material is, about how much there is, and whether it loads over the top, at a dock or by excavator. Flag anything you can’t identify. Mention discarded computer equipment or televisions, since state law bars anyone from knowingly disposing of them in a landfill.

How is a walking floor haul priced?

By the load or by the hour, with a free estimate. Tell us the material, roughly how much there is and how it will load, and we’ll quote the haul.

Do you haul on weekends?

No. We’re closed Saturday and Sunday. Call Monday through Friday to book a trailer or set up a pickup.

Do you haul land-clearing debris in High Point?

Yes. An excavator can load stumps, limbs and brush live, and mulch and wood waste go over the top. Before clearing, check the land-clearing, erosion and stream buffer cards above. Getting plans and permits is up to you or the owner.

Do you rent dumpsters in High Point too?

Yes. If one 30-yard dumpster can hold the pile, a dumpster may be the simpler haul. Our High Point dumpster page lists the sizes, or call and we’ll help you pick one.

Get a walking floor
quote in High Point

Send us the High Point site address, the material and how you’ll load it: over the top, at a dock or by excavator. The quote prices the haul and gives the trailer’s exact capacity.