Where the trailer loads
Plan on filling the trailer on your lot or at your dock, not in the street. When you call, tell us where on your site it will sit while your crew loads it. Ask the City how its rules apply to your site.
Services
Ready to book?
Orders placed by 4:00 PM are delivered the next business day. Free quote either way — just get in touch.
Get a quoteCentral NC
Thirty-eight towns.
Eleven counties.
Wake County
Guilford County
Alamance County
Johnston County
Orange County
Chatham County
Forsyth County
Harnett County
Durham County
Lee County
Randolph County
Construction + Industrial · Walking Floor Trailers · High Point, NC
A walking floor trailer unloads itself, with hydraulic slats in its floor pushing the load out horizontally. It holds about 120 cubic yards, four times a standard 30-yard dumpster. Your crew fills it over the top, at a dock or live by excavator. We dispatch it from our Mebane yard, about an hour away. Smithfield is the backup.
For a High Point job, the trailer takes about 120 cubic yards of building, roofing, cleanout or clearing waste. Fill it over the top, at a dock or by excavator. It leaves our Mebane yard, about an hour away.

Loading, waste, demolition
Settle two things before a High Point trailer arrives: where it sits while your crew loads it and which waste can share it. A teardown adds a third, the City’s demolition permit. Each card says what to plan and who to ask.
Plan on filling the trailer on your lot or at your dock, not in the street. When you call, tell us where on your site it will sit while your crew loads it. Ask the City how its rules apply to your site.
State law (G.S. 130A-290) leaves land-clearing, inert and yard debris out of its definition of construction and demolition (C&D) waste. If a High Point job turns up building debris and stumps or brush, plan a separate haul for each where you can. Tell us what is going in when you call.
The City permits teardowns of residential and commercial structures through its Structure Removal process, and its Development Services Center issues the Demolished Structure Permit. In a local historic district, or for a Guilford County Historic Landmark, a Certificate of Appropriateness comes first. Ask the Development Services Center what your teardown needs.
Haul by job
Each row starts with a kind of High Point job and ends with the haul we would suggest. The first five rows lead to the walking floor trailer, and four of those name a loading method. The sixth row is for a pile one 30-yard dumpster can hold.
| Your High Point job | The haul |
|---|---|
| Building or demolition debris too big for one dumpster | The walking floor trailer, which holds about 120 cubic yards |
| Pallets or bulky waste waiting at a plant or warehouse dock | The trailer, backed into your dock with a dock plate so a forklift or pallet jack can fill it |
| Stumps, limbs and brush from clearing a site | The trailer, positioned with your crew so an excavator can load it live |
| Shingles, debris and insulation board from a roof tear-off | The trailer, loaded over the top |
| Mulch, wood waste or bulk recyclables | The trailer, loaded over the top; its moving floor pushes the load out at unloading |
| A pile that one 30-yard dumpster can hold | Likely a dumpster, since the trailer holds about four times as much |
High Point jobs
Each card covers one kind of work the trailer hauls and how it loads. The cards describe the work, not a site, and the builds tab below names two High Point sites of that kind.
Building, remodel and teardown debris
Top load or excavator
Debris from building, remodeling and teardowns goes in over the top, or by excavator on a larger demolition. Demolishing a structure also takes a City permit, covered on the demolition card above. Tell us what is in the load.
Shingles, debris, insulation board
Top load
Shingles, debris and insulation board from a tear-off go in over the top. Clean, source-separated shingles can be recycled under state guidance, so keep a shingle-only load apart. Removing more than 160 square feet of friable asbestos roofing needs a state permit.
Pallets, bulky waste, recyclables
Dock and dock plate
We can back our trailer into a loading dock with a dock plate, and a small forklift or pallet jack loads it. State law bars anyone from knowingly disposing of wooden pallets in a landfill, except one permitted to accept only C&D debris.
Stumps, limbs, brush, wood waste
Excavator live-load
On a clearing job, an excavator loads the trailer live. On land the City owns or controls, including public rights-of-way, its Development Ordinance needs the Urban Forestry Committee’s okay before anyone removes, prunes or plants a tree. The same goes for storing stone, sand, concrete or other impervious materials that may impede water, air or fertilizer reaching its roots.
Bulk recyclables, transfer loads
Top load
Bulk recyclables and transfer station loads go in over the top, and the moving slats push them out horizontally when the trailer unloads. State rules define inert debris waste as only asphalt, cured concrete, brick, concrete block, gravel and rock. Tell us what the load holds when you book.
By type of work
High Point work falls into two tabs: builds, demolition and roofing, then plant cleanouts and land clearing. Each tab gives the haul, loading, materials, a step before work and sites of that kind.
| The haul | One trailer that holds about 120 cubic yards. Your quote gives the exact capacity for how it is configured. |
|---|---|
| Loading | Loose debris and tear-off go in over the top. When an excavator loads, our team coordinates with your crew to position the trailer. |
| Materials | Construction and demolition waste, and shingles, debris and insulation board from roof tear-offs. |
| Before work | State rules call for an asbestos inspection before any demolition or renovation begins. A demolition also needs notice to the state’s Health Hazards Control Unit at least 10 working days ahead. |
| Sites like | Campus builds like High Point University’s Charman Library, which HPU said on July 16, 2026 was about half complete. Building conversions like Showplace West on South Main Street, which LBD Investments bought to turn into apartments. WFDD reported on April 15, 2026 that the developer had already started demolition. |
| The haul | The same trailer, priced by the load or by the hour, with a free estimate. |
|---|---|
| Loading | For a forklift or pallet jack, we can back it into your dock with a dock plate. On a clearing job, our team coordinates with your crew to position it where the excavator can reach. |
| Materials | From a plant: palletized or bulky materials, industrial waste and recyclables. From clearing: land-clearing debris, mulch and wood waste. |
| Before work | The land-clearing card above covers trees on City land, and the rules cards below cover erosion control and stream buffers. Getting plans and permits is up to you or the owner. |
| Sites like | Any plant or warehouse with a loading dock, or land being cleared before building. |
High Point’s rules
The streets card rests on the City’s right-of-way pages, and the other two on its Development Ordinance, amended through July 21, 2025. Each card says what that means for the trailer and who to ask. Permits are yours or the owner’s to get.
Load on your lot or at your dock, not in the street. The City says any lane or sidewalk closure along public streets in its corporate limits takes a Lane Closure Permit from its Transportation Department. Any disturbance of City streets, curb and gutter, or sidewalk takes a separate Right-of-Way Disturbance permit from Engineering Services. Ask those offices about your site.
High Point runs its own erosion control program for most projects in its city limits and extraterritorial jurisdiction. Most land disturbance of more than an acre needs an erosion control plan and a land disturbance permit, and some smaller sites need them too. At any size, take all reasonable measures to protect public and private property from damage. Ask the City what your site needs.
For most work, High Point’s Development Ordinance keeps a buffer at least 50 feet wide on all sides of perennial and intermittent streams, lakes and ponds. The inner 50 feet stays undisturbed except as the rules allow. Keep the trailer out of any buffer, and ask the City what your site needs.
Loading and pickup
The trailer comes from our Mebane yard, about an hour away. Your crew loads it on your lot or at your dock, then calls us for pickup.
High Point hauls go out from our Mebane yard, about an hour from the city, and Smithfield backs it up. When you call, have the site address, the material and your loading method ready.
We can back our trailer into a loading dock with a dock plate. When you book, tell us where your dock or loading area is. On a clearing job, our team coordinates with your crew to position the trailer. If your lot looks too tight, call before you book.
Once the trailer is full, call us to coordinate a pickup time and we’ll be there. We take calls Mon – Fri · 7:30 AM – 4:30 PM and are closed Saturday and Sunday. If the job will fill the trailer more than once, tell us when you book.
High Point trailer FAQ
Answers on capacity, a High Point site with no room to load, what to tell us about a load, pricing, weekends, land clearing and dumpsters. If your question isn’t here, call before you book.
About 120 cubic yards, four times a standard 30-yard dumpster. The exact figure depends on how the trailer is configured, and your quote states it.
Call us before you book, and plan on your lot or a dock, not the street. Closing a lane or sidewalk along a public street in the city limits takes a City permit, and so does disturbing a City street, curb or sidewalk. The streets card above names both, so ask those offices how they apply to your site.
What the material is, about how much there is, and whether it loads over the top, at a dock or by excavator. Flag anything you can’t identify. Mention discarded computer equipment or televisions, since state law bars anyone from knowingly disposing of them in a landfill.
By the load or by the hour, with a free estimate. Tell us the material, roughly how much there is and how it will load, and we’ll quote the haul.
No. We’re closed Saturday and Sunday. Call Monday through Friday to book a trailer or set up a pickup.
Yes. An excavator can load stumps, limbs and brush live, and mulch and wood waste go over the top. Before clearing, check the land-clearing, erosion and stream buffer cards above. Getting plans and permits is up to you or the owner.
Yes. If one 30-yard dumpster can hold the pile, a dumpster may be the simpler haul. Our High Point dumpster page lists the sizes, or call and we’ll help you pick one.
Also in High Point
If the pile fits one dumpster, a dumpster may be the better haul. Restrooms, handwashing stations, fencing and more come from our Mebane yard, backed by Smithfield, on the same phone number. Each card links to its High Point page where one exists.
Send us the High Point site address, the material and how you’ll load it: over the top, at a dock or by excavator. The quote prices the haul and gives the trailer’s exact capacity.